Friday 24 February 2012

Shooting

Yesterdays shoot went well. We Shot all of the bedroom scenes in 1 evening. There was a great atmosphere when filming and we got so much done. The equipment was in tip top condition and the people behind set put everyone in a good mood. We looked over the footage today and found that all shots were done fine except the close up shot of melek filing her nails down which appeared blurry. So we contacted our actress and told her if we can re-film just that part again but she had her fake nails removed already so we decided to scrap that footage when we start editing after receiving feedback from 4 people saying it is noticeable.

Monday 20 February 2012

Delay In Shooting

There has been 2 setbacks in terms of shooting out main task. First was that our school had us to go to our extra curriculum activity when we was suppose to shoot on 25-02-12. The second was on the 27-01-12 where one of our team mates had to be taken to hospital so we couldn't film. The picture provided is evidence for this.

Wednesday 15 February 2012

Shot List

Shot List

This is the shot list for our film. It has the shots that corresponds with the shots given in the script. It has keywords about what the shot is going to be about so we know what props to bring to the shoot.

Sunday 12 February 2012

Props List

Props List

This is all the props needed for the film production excluding film equipment

Friday 10 February 2012

Lighting

Lighting is crucial in our movie so we had to get it spot on. Nobody in the group has used the lights before so today was the day we experimented with them. We had filters to adjust the colour of the shot which we thought was useful because the raw light itself gave too much exposure. we were trying to get a fiery dim orange colour to make the stalker look as if he is in a lair/dungeon.

We Found a way to alter the amount of light coming in by adjusting the barn doors. This would be useful in the main task.

Tuesday 7 February 2012

Final Script

Final Final Script This is the final script after many changes were made. We took out the black screen transitions as it was simply copping the opening sequence of Seven so we thought about having a typing effect

Monday 6 February 2012

Company Logo


We came up with different names for our company.

  • Smiley Face productions - A very ironic company name as our movie is a horror/thriller
  • Red eyes studios - Just a name we thought was catchy
  • Broken bone productions
Example Of Sample Logo

We Decided to go with hangman productions in order for the audience to expect a scary movie; made in Adobe Photoshop CS5

Wednesday 1 February 2012

Complete Storyboard

Changes were made to the storyboard as we changed the titles from the similar ones showed in seven to a more original typing effect that has more of a relation to the film.